IMG_2665
Frame is fluxed and ready for tacking. The frame will be tack welded in the jig and then removed and aligned prior to fully brazing all joints, etc.

Index      Previous      Next

Previous photo Next photo Thumbnail page


Generated by JAlbum 6.4   Design inspired by Exhibit Engine
   
Index      Previous      Next